This was a tricky install on a contemporary home in Leicester. Several wall mounted heads had to be located strategically on interior walls due to the houses design. Refrigerant lines had to be boxed in with pine boards which the customer will paint in the future.

Work Performed January 2022 Mitsubishi 3C30 and 3C24 now heating this house instead of propane boiler. 2 outdoor units and 5 heads

Electric heat house in Worcester swapped over to Mitsubishi heat pumps. We installed a multi zone 3C30 and a 2C20. 5 heads total for the main living space, bedrooms, and finished basement. Just in time for the antarctic weather

New install in Gardner. Two single zones installed for the main house replacing this customers oil furnace. Both of these heads will heat and cool the entire house due to its open layout and the transfer grilles we installed upstairs. This simple design qualifies for a $10,000 rebate as we covered the heat load for the home.
We also Replaced the outdoor unit on his shop with a new MXZ-3C24 multi zone.
We also Replaced the outdoor unit on his shop with a new MXZ-3C24 multi zone.

Just finished this one today in spencer. One single zone 18k head for finished basement and one single zone 18k head with wireless tstat for main living area. One Multi zone condenser with three heads for each of the three bedrooms.
Customer previously had electric heat with winter heating bills topping $1000/month. This will help!
Customer previously had electric heat with winter heating bills topping $1000/month. This will help!

Just completed this 4 family apartment building in Westminster each apartment got Mitsubishi hyper heat 24,000 BTU condensers with three indoor heads for each bedroom and main living area. Great owners and tenants to work for! glad we could upgrade from the existing electric baseboard heat

New install in Worcester finished yesterday. 3 wall mounted heads and 1 ceiling cassette for the master

One day install in North Brookfield. 2 Mitsubishi one to ones supplementing their existing heat and eliminating the need for woodstoves. Both wall-mounted FS12 heads

2 family in Gardner with a finished attic. We did 5 outdoor units and 6 heads inside. This replaced their pellet stoves and electric heat.
A couple 3rd floor connections required a fully extended 40’ ladder. Not a lot of fun! Luckily all connections were good when we pressure tested and vacuumed them. On to the next
A couple 3rd floor connections required a fully extended 40’ ladder. Not a lot of fun! Luckily all connections were good when we pressure tested and vacuumed them. On to the next